Project Details
This page displays current information for project DEA: 080C2514.
Project Information
Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
Award Date | 06/06/2018 |
Closeout Date | Not set |
Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
Location Description | LA/SBD County Line to PM 13.2 near I-15 |
QA Service Level | 1 (Verified on 10/16/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jcorona@syrusaengineering.com | Jose Corona | Resident Engineer | Caltrans RE DB |
james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 921-930 of 1071 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-07-14-4 | 07/14/2021 | 07/15/2021 | Quality Assurance | Concrete | View |
2021-07-08-4 | 07/08/2021 | 07/13/2021 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
2021-07-10-1 | 07/10/2021 | 07/11/2021 | Quality Assurance | Concrete | View |
2021-07-02-12 | 07/02/2021 | 07/05/2021 | Quality Assurance | Concrete | View |
2021-06-28-24 | 06/28/2021 | 07/01/2021 | Verification | Aggregate | View |
2021-06-28-21 | 06/28/2021 | 06/30/2021 | Quality Assurance | Aggregate | View |
2021-06-17-1 | 06/17/2021 | 06/21/2021 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2021-06-20-2 | 06/20/2021 | 06/21/2021 | Quality Assurance | Concrete | View |
2021-06-17-21 | 06/17/2021 | 06/19/2021 | Quality Assurance | Concrete | View |
2021-06-15-1 | 06/15/2021 | 06/18/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods