Project Details
This page displays current information for project DEA: 080C2514.
Project Information
Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
Award Date | 06/06/2018 |
Closeout Date | Not set |
Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
Location Description | LA/SBD County Line to PM 13.2 near I-15 |
QA Service Level | 1 (Verified on 10/16/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jcorona@syrusaengineering.com | Jose Corona | Resident Engineer | Caltrans RE DB |
james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 131-140 of 1072 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-09-17-5 | 09/17/2023 | 09/21/2023 | Production Start-Up | Asphalt Binder | View |
2023-11-04-29 | 11/04/2023 | 11/16/2023 | Verification | Asphalt Binder | View |
2020-07-06-11 | 07/06/2020 | 07/09/2020 | Quality Assurance | Concrete | View |
2020-07-07-1 | 07/07/2020 | 07/08/2020 | Quality Control | Concrete | View |
2020-08-20-30 | 08/20/2020 | 08/24/2020 | Quality Assurance | Concrete | View |
2020-08-21-17 | 08/21/2020 | 08/24/2020 | Quality Assurance | Concrete | View |
2020-08-27-10 | 08/27/2020 | Quality Assurance | Concrete | View | |
2020-08-27-16 | 08/27/2020 | 08/31/2020 | Quality Assurance | Concrete | View |
2020-08-28-11 | 08/28/2020 | 08/31/2020 | Quality Assurance | Concrete | View |
2020-09-18-19 | 09/18/2020 | 09/21/2020 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods