Project Details
This page displays current information for project DEA: 101F0804.
Project Information
Project Identifiers | Project ID: 211968 DEA: 101F0804 EFIS: 1016000116 |
---|---|
DIST-CO-RTE-PM | 10-SJ-4,26-19.75,1.1 |
Award Date | 03/15/2017 |
Closeout Date | 04/05/2018 |
Work Description | HEAT STRAIGHTENING EXISTING STEEL GIRDERS. |
Location Description | SAN JOAQUIN COUNTY IN STOCKTON ON ROUTE 4 AT FARMINGTON ROAD OVERCROSSING AND ON ROUTE 26 AT ROUTE 26/99 SEPARATION. |
QA Service Level | 1 (Verified on 05/16/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ranbir.bhullar@dot.ca.gov | Rambir Bhullar | Resident Engineer | Caltrans RE DB |
chau.ha@dot.ca.gov | Chau Ha | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-06-28-2 | 06/28/2017 | 06/30/2017 | Acceptance | SMTL TM3 - Fastener Assembly | View |
2017-09-27-10 | 09/27/2017 | 10/02/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods