Project Details
This page displays current information for project DEA: 043G6414.
Project Information
Project Identifiers | Project ID: 211931 DEA: 043G6414 EFIS: 0416000348 |
---|---|
DIST-CO-RTE-PM | 04-NAP-29-37.0 |
Award Date | 03/17/2017 |
Closeout Date | 04/22/2020 |
Work Description | SCOUR REPLACE BRIDGE |
Location Description | NAPA COUNTY IN CALISTOGA AT NAPA RIVER BRIDGE |
QA Service Level | 1 (Verified on 02/15/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
danilo.patenia@dot.ca.gov | Danilo Patenia | Resident Engineer | Caltrans RE DB |
nana.budu@dot.ca.gov | Nana Budu | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 39 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-02-23-3 | 02/23/2018 | 02/26/2018 | Acceptance | Concrete | View |
2018-02-15-5 | 02/15/2018 | 02/21/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2017-12-20-5 | 12/20/2017 | 12/22/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2017-12-14-36 | 12/14/2017 | 12/15/2017 | Quality Assurance | SMTL TM7 - Epoxy Coated Dowels | View |
2017-11-20-2 | 11/20/2017 | 11/20/2017 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2017-11-06-4 | 11/06/2017 | 11/08/2017 | Acceptance | Concrete | View |
2017-10-26-3 | 10/26/2017 | 10/30/2017 | Acceptance | Concrete | View |
2017-10-20-4 | 10/20/2017 | 10/20/2017 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
2017-08-01-17 | 08/01/2017 | 08/09/2017 | Quality Assurance | Concrete | View |
2017-08-01-10 | 08/01/2017 | 08/04/2017 | Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods