Project Details
This page displays current information for project DIME:211908.
Project Information
| Project Identifiers | Project ID: 211908 Permit Numbers: 04166DP1823 0414NMC2026 04166RW1963 0416NRW1948 |
|---|---|
| DIST-CO-RTE-PM | 04--123-4.1/4.4 |
| Award Date | 05/17/2016 |
| Closeout Date | 01/18/2019 |
| Work Description | Improvements include constructing multi-use pathway along SB San Pablo Ave. from 150 feet south of Dartmouth street to 400 feet north of Monroe Street. |
| Location Description | San Pablo Ave, Albany |
| QA Service Level | 1 (Verified on 01/06/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| No results found. | |||
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
