Project Details
This page displays current information for project DEA: 08368514.
Project Information
Project Identifiers | Project ID: 211889 DEA: 08368514 EFIS: 0813000077 |
---|---|
DIST-CO-RTE-PM | 08-SBD-15-81.1/87.5&177.3/181.1 |
Award Date | 05/02/2017 |
Closeout Date | 12/09/2019 |
Work Description | CONSTRUCT AIF AND DEMOLISH EXISTING AIF IN YERMO |
Location Description | SAN BERNARDINO COUNTY FROM 0.6 MILE NORTH OF YERMO ROAD OVERCROSSING TO 1.0 MILE SOUTH OF MINNEOLA ROAD OVERCROSSING AND FROM 1.2 MILE NORTH OF NIPTON ROAD OVERCROSSING TO 0.5 MILE SOUTH OF YATES WELL ROAD OVERCROSSING |
QA Service Level | 1 (Verified on 04/07/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
darcy.davis@dot.ca.gov | Darcy Davis | Resident Engineer | Caltrans RE DB |
luis.negrete@dot.ca.gov | Luis Negrete | Structural Representative | Caltrans SR DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 19 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-06-01-8 | 06/01/2018 | 06/04/2018 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2018-02-26-4 | 02/26/2018 | 03/08/2018 | Quality Assurance | Concrete | View |
2018-03-05-5 | 03/05/2018 | 03/08/2018 | Quality Assurance | Concrete | View |
2018-02-09-5 | 02/09/2018 | 02/15/2018 | Quality Control | Concrete | View |
2018-02-02-29 | 02/02/2018 | 02/13/2018 | Quality Control | Concrete | View |
2018-01-18-8 | 01/18/2018 | 01/26/2018 | Quality Assurance | Concrete | View |
2017-12-15-15 | 12/15/2017 | 01/09/2018 | Quality Assurance | SMTL TM5 - Couplers | View |
2017-12-15-14 | 12/15/2017 | 01/09/2018 | Quality Assurance | SMTL TM5 - Couplers | View |
2017-12-18-18 | 12/18/2017 | 12/21/2017 | Quality Assurance | Concrete | View |
2017-12-11-9 | 12/11/2017 | 12/15/2017 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods