Project Details
This page displays current information for project DEA: 081E6504.
Project Information
Project Identifiers | Project ID: 211855 DEA: 081E6504 EFIS: 0814000059 |
---|---|
DIST-CO-RTE-PM | 08-RIV-60-R0.0/7.5 |
Award Date | 12/29/2016 |
Closeout Date | 06/23/2021 |
Work Description | INSTALL DOUBLE LUMINAIRE LIGHTINGS AND UPGRADE EXISTING LIGHTINGS |
Location Description | RIVERSIDE COUNTY FROM SAN BERNARDINO COUNTY LINE TO VALLEY WAY UNDERCROSSING |
QA Service Level | 1 (Verified on 04/07/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
miguel.calixto@dot.ca.gov | Miguel Calixto | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-01-04-17 | 01/04/2018 | 01/08/2018 | Quality Assurance | Concrete | View |
2017-12-22-15 | 12/22/2017 | 12/27/2017 | Quality Assurance | Concrete | View |
2017-05-25-1 | 05/25/2017 | 05/25/2017 | Verification | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods