Project Details
This page displays current information for project DEA: 112T2174.
Project Information
Project Identifiers | Project ID: 211848 DEA: 112T2174 EFIS: 1116000131 |
---|---|
DIST-CO-RTE-PM | 11-SD-5-R37.4 - R46.5 |
Award Date | 12/22/2016 |
Closeout Date | Not set |
Work Description | (Alternative Delivery) CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave. |
Location Description | IN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING |
QA Service Level | 1 (Verified on 01/31/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
steve.mcmillan@dot.ca.gov | Steve McMillan | Resident Engineer | Caltrans RE DB |
phong.t.le@dot.ca.gov | Phong Le | Structural Representative | Caltrans SR DB |
james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 237 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-10-12-1 | 10/12/2017 | 10/16/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2017-10-26-1 | 10/26/2017 | 10/30/2017 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2017-10-26-2 | 10/26/2017 | 10/30/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2017-11-01-1 | 11/01/2017 | 11/03/2017 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2017-11-21-1 | 11/21/2017 | 11/29/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2017-11-22-1 | 11/22/2017 | 12/01/2017 | Quality Assurance | SMTL TM5 - Couplers | View |
2017-11-30-1 | 11/30/2017 | 12/04/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2017-12-01-1 | 12/01/2017 | 12/04/2017 | Acceptance | SMTL TM7 - Epoxy Coated Rebar | View |
2017-11-28-1 | 11/28/2017 | 12/06/2017 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2017-12-18-3 | 12/18/2017 | 12/18/2017 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods