Project Details
This page displays current information for project DEA: 112T2174.
Project Information
Project Identifiers | Project ID: 211848 DEA: 112T2174 EFIS: 1116000131 |
---|---|
DIST-CO-RTE-PM | 11-SD-5-R37.4 - R46.5 |
Award Date | 12/22/2016 |
Closeout Date | Not set |
Work Description | (Alternative Delivery) CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave. |
Location Description | IN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING |
QA Service Level | 1 (Verified on 01/31/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
steve.mcmillan@dot.ca.gov | Steve McMillan | Resident Engineer | Caltrans RE DB |
phong.t.le@dot.ca.gov | Phong Le | Structural Representative | Caltrans SR DB |
james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 237 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-05-25-1 | 05/25/2018 | 05/30/2018 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2018-05-25-2 | 05/25/2018 | 05/30/2018 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2018-05-31-1 | 05/31/2018 | 06/01/2018 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2018-06-07-2 | 06/07/2018 | 06/12/2018 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2018-06-11-4 | 06/11/2018 | 06/11/2018 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2018-06-18-1 | 06/18/2018 | 06/19/2018 | Acceptance | SMTL TM5 - Welded Hoops | View |
2018-06-26-1 | 06/26/2018 | Acceptance | SMTL TM7 - Epoxy Coated Rebar | View | |
2018-08-17-1 | 08/17/2018 | 08/21/2018 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2018-08-20-3 | 08/20/2018 | 08/24/2018 | Quality Assurance | SMTL TM5 - Couplers | View |
2018-09-11-1 | 09/11/2018 | 09/17/2018 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods