Project Details
This page displays current information for project DEA: 112T2174.
Project Information
Project Identifiers | Project ID: 211848 DEA: 112T2174 EFIS: 1116000131 |
---|---|
DIST-CO-RTE-PM | 11-SD-5-R37.4 - R46.5 |
Award Date | 12/22/2016 |
Closeout Date | Not set |
Work Description | (Alternative Delivery) CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave. |
Location Description | IN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING |
QA Service Level | 1 (Verified on 01/31/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
steve.mcmillan@dot.ca.gov | Steve McMillan | Resident Engineer | Caltrans RE DB |
phong.t.le@dot.ca.gov | Phong Le | Structural Representative | Caltrans SR DB |
james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 237 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-03-05-1 | 03/05/2018 | 03/09/2018 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2018-03-09-2 | 03/09/2018 | 03/12/2018 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2018-03-09-3 | 03/09/2018 | 03/21/2018 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2018-04-05-3 | 04/05/2018 | 04/05/2018 | Acceptance | SMTL TM7 - Epoxy Coated Rebar | View |
2018-04-09-1 | 04/09/2018 | 04/16/2018 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2018-04-17-1 | 04/17/2018 | 04/19/2018 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2018-05-07-1 | 05/07/2018 | Quality Assurance | SMTL TM5 - Headed Bars | View | |
2018-05-17-12 | 05/17/2018 | 05/21/2018 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
2018-05-22-1 | 05/22/2018 | 05/23/2018 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2018-05-22-2 | 05/22/2018 | 05/23/2018 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods