Project Details
This page displays current information for project DIME:211810.
Project Information
Project Identifiers | Project ID: 211810 Permit Numbers: 0713NUL2279 0716NRW1416 0717NRW1667 0717NRT0827 07176DP0881 07176RT1257 |
---|---|
DIST-CO-RTE-PM | 07--1-30.4/30.4 |
Award Date | 02/01/2014 |
Closeout Date | 06/16/2021 |
Work Description | Attaching 6-8" and 2-4" conduits for the length of 330' each conduit to existing structure of Ballona Creek Bridge(BR#53-0118). This is the parent permit of the following permits: 0716NRW1416, 0717NRW1667, 0717NRT0827, 07176DP0881. |
Location Description | Lincoln Blvd. @ Ballona Creek Bridge (#53-0118), Los Angeles. This is the parent permit of the following permits: 0716NRW1416, 0717NRW1667, 0717NRT0827, 07176DP0881. |
QA Service Level | 1 (Verified on 09/29/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
tuan.hua@dot.ca.gov | Tuan Hua | Resident Engineer | Caltrans RE DB |
frank.lotfi@dot.ca.gov | Frank Lotfi | Oversight Structural Representative | Caltrans SRO DB |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-08-28-13 | 08/28/2017 | 09/08/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods