Project Details
This page displays current information for project DEA: 04209504.
Project Information
Project Identifiers | Project ID: 211777 DEA: 04209504 EFIS: 0412000116 |
---|---|
DIST-CO-RTE-PM | 04-MRN,SON-1-50.2/50.5,0.0/0.2 |
Award Date | 01/04/2017 |
Closeout Date | 10/21/2019 |
Work Description | REPLACE ESTERO BRIDGE AND REALIGN APPROACHING ROADWAY; Bridge No. 27-0121 |
Location Description | MARIN AND SONOMA COUNTIES NEAR VALLEY FORD FROM 0.4 MILE SOUTH OF ESTERO AMERICANO BRIDGE TO 0.2 MILE NORTH OF ESTERO AMERICANO BRIDGE |
QA Service Level | 1 (Verified on 01/17/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
scott.hislop@dot.ca.gov | Scott Hislop | Resident Engineer | Caltrans RE DB |
clifford.law@dot.ca.gov | Clifford Law | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 51-59 of 59 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-07-19-20 | 07/19/2018 | Quality Assurance | Concrete | View | |
2018-07-19-22 | 07/19/2018 | 07/24/2018 | Quality Assurance | Concrete | View |
2018-07-19-23 | 07/19/2018 | 07/24/2018 | Quality Assurance | Concrete | View |
2018-07-23-11 | 07/23/2018 | Quality Assurance | Concrete | View | |
2018-07-26-13 | 07/26/2018 | Quality Assurance | Concrete | View | |
2018-08-14-12 | 08/14/2018 | Quality Assurance | Concrete | View | |
2018-08-14-13 | 08/14/2018 | 08/20/2018 | Quality Assurance | Concrete | View |
2018-08-14-14 | 08/14/2018 | 08/20/2018 | Quality Assurance | Concrete | View |
2017-05-23-2 | 05/23/2017 | 05/24/2017 | Acceptance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods