Project Details
This page displays current information for project DEA: 081G8504.
Project Information
Project Identifiers | Project ID: 211765 DEA: 081G8504 EFIS: 0816000096 MINOR: 08A2744 |
---|---|
DIST-CO-RTE-PM | 08-SBD-83-R0.2/R1.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Construct two (2) gates for Chino Creek Flood Control |
Location Description | San Bernadino Country Emergency Project - Construct two (2) gates for Chino Creek Flood Control |
QA Service Level | 1 (Verified on 09/06/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
nick.truong@dot.ca.gov | Nick Truong | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-03-17-7 | 03/17/2017 | 03/21/2017 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods