Project Details
This page displays current information for project DEA: 101C4214.
Project Information
Project Identifiers | Project ID: 211716 DEA: 101C4214 EFIS: 1015000131 |
---|---|
DIST-CO-RTE-PM | 10-SJ-99-14.3/14.9,18.4/23.0 |
Award Date | 12/28/2016 |
Closeout Date | 10/09/2018 |
Work Description | RAMP WIDENING, INSTALL RAMP METERING AND FIBER OPTIC CABLE. |
Location Description | SAN JOAQUIN COUNTY IN STOCKTON FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF ARCH ROAD UNDERCROSSING AND FROM 0.3 MILE NORTH OF MAIN STREET OVERCROSSING TO 0.1 MILE NORTH OF HAMMER LANE OVERCROSSING |
QA Service Level | 1 (Verified on 10/20/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
obaidullah.rashid@dot.ca.gov | Abdul (Obaidullah) Rashid | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-09-11-2 | 09/11/2017 | 09/12/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2017-09-11-1 | 09/11/2017 | 09/12/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2017-07-10-3 | 07/10/2017 | 07/12/2017 | Quality Assurance | Concrete | View |
2017-06-28-3 | 06/28/2017 | 06/30/2017 | Quality Assurance | Concrete | View |
2017-06-16-6 | 06/16/2017 | 06/20/2017 | Quality Assurance | Concrete | View |
2017-06-09-6 | 06/09/2017 | 06/12/2017 | Quality Control | Concrete | View |
2017-06-09-5 | 06/09/2017 | 06/12/2017 | Quality Control | Concrete | View |
2017-05-30-2 | 05/30/2017 | 05/31/2017 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods