Project Details
This page displays current information for project DEA: 080R1204.
Project Information
Project Identifiers | Project ID: 211714 DEA: 080R1204 EFIS: 0812000026 |
---|---|
DIST-CO-RTE-PM | 08-SBD-40-0.0/R25.0 |
Award Date | 12/21/2016 |
Closeout Date | 06/23/2021 |
Work Description | REGRADE MEDIAN CROSS SLOPE |
Location Description | SAN BERNARDINO COUNTY IN AND NEAR BARSTOW FROM JUNCTION 15/40 TO 1.4 MILES EAST OF FORT CADY ROAD OVERCROSSING |
QA Service Level | 1 (Verified on 09/21/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
thanh.pham@dot.ca.gov | Thanh Pham | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 32 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-01-22-1 | 01/22/2018 | 01/26/2018 | Quality Assurance | Concrete | View |
2018-01-31-13 | 01/31/2018 | 02/08/2018 | Quality Assurance | Concrete | View |
2017-05-02-7 | 05/02/2017 | 05/09/2017 | Quality Control | Concrete | View |
2017-05-08-8 | 05/08/2017 | 05/12/2017 | Quality Control | Concrete | View |
2017-05-11-8 | 05/11/2017 | 05/17/2017 | Quality Control | Concrete | View |
2017-05-12-3 | 05/12/2017 | 05/17/2017 | Quality Control | Concrete | View |
2017-05-15-8 | 05/15/2017 | 05/19/2017 | Quality Control | Concrete | View |
2017-06-01-11 | 06/01/2017 | 06/06/2017 | Quality Control | Concrete | View |
2017-06-14-16 | 06/14/2017 | 06/20/2017 | Quality Control | Concrete | View |
2017-06-27-6 | 06/27/2017 | 07/03/2017 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods