Project Details
This page displays current information for project DEA: 042A3204.
Project Information
Project Identifiers | Project ID: 211690 DEA: 042A3204 EFIS: 0400000817 |
---|---|
DIST-CO-RTE-PM | 04-NAP-121-9.2/9.4 |
Award Date | 12/01/2016 |
Closeout Date | 01/23/2019 |
Work Description | ROADWAY WIDENING, BRIDGE REPLACEMENT, CREEK GRADING |
Location Description | NAPA COUNTY IN NAPA AT SILVERADO TRAIL ROAD |
QA Service Level | 1 (Verified on 01/03/2017) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Chris.moulton@dot.ca.gov | Chris Moulton | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 25 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-07-26-3 | 07/26/2017 | 07/27/2017 | Quality Control | Concrete | View |
2017-07-26-4 | 07/26/2017 | 07/27/2017 | Quality Control | Concrete | View |
2017-07-26-5 | 07/26/2017 | 07/27/2017 | Quality Control | Concrete | View |
2017-07-28-12 | 07/28/2017 | 07/31/2017 | Quality Assurance | Concrete | View |
2017-07-28-13 | 07/28/2017 | 07/31/2017 | Quality Assurance | Concrete | View |
2017-08-07-14 | 08/07/2017 | 08/09/2017 | Quality Assurance | Concrete | View |
2017-08-07-15 | 08/07/2017 | 08/09/2017 | Quality Assurance | Concrete | View |
2017-08-07-16 | 08/07/2017 | 08/09/2017 | Quality Assurance | Concrete | View |
2017-08-11-5 | 08/11/2017 | 08/14/2017 | Quality Assurance | Concrete | View |
2017-08-11-6 | 08/11/2017 | 08/14/2017 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods