Project Details
This page displays current information for project DEA: 022C0904.
Project Information
Project Identifiers | Project ID: 211669 DEA: 022C0904 EFIS: 0200000161 |
---|---|
DIST-CO-RTE-PM | 02-PLU-70-50.6/51.7 |
Award Date | 11/16/2016 |
Closeout Date | 11/12/2020 |
Work Description | BRIDGE WIDENING AND DECK REPLACEMENT, HMA, MGS AND CULVERT REPLACEMENT |
Location Description | PLUMAS COUNTY NEAR QUINCY FROM 0.6 MILE WEST TO 0.5 MILE EAST OF SPRING GARDEN BRIDGE OVERHEAD |
QA Service Level | 1 (Verified on 10/25/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Ronald.Collins@dot.ca.gov | Ronald Collins | Resident Engineer | Caltrans RE DB |
jeff.rothgery@dot.ca.gov | Jeffrey Rothgery | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-21 of 21 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-10-11-4 | 10/11/2018 | 10/10/2018 | Acceptance | Aggregate | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods