Project Details

This page displays current information for project DEA: 030F3104.

Project Information

Project IdentifiersProject ID: 211588
DEA: 030F3104
EFIS: 0300000078
DIST-CO-RTE-PM03-ED-49-23.6/24.5
Award Date12/12/2016
Closeout Date01/08/2019
Work DescriptionREPLACE BRIDGE.
Location DescriptionEL DORADO COUNTY NEAR COLOMA FROM 0.1 MILE EAST OF MARSHALL ROAD TO 0.3 MILE EAST OF LOTUS ROAD
QA Service Level1 (Verified on 10/19/2016)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
jeffrey.hamm@dot.ca.govJeff HammResident EngineerCaltrans RE DB
glen.wheeler@dot.ca.govGlen WheelerStructural RepresentativeCaltrans SR DB
justin.palmaymesa@dot.ca.govJustin PalmaymesaMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 41-50 of 67 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2017-08-21-708/21/201708/22/2017Quality AssuranceConcreteView
2017-07-26-1207/26/201707/31/2017Quality AssuranceSMTL TM6 - Ductile Iron Cast SamplesView
2017-07-18-1707/18/201707/20/2017Quality AssuranceSMTL TM5 - CouplersView
2017-06-26-1006/26/201706/29/2017Quality AssuranceSMTL TM6 - Ductile Iron Cast SamplesView
2017-06-20-306/20/201706/20/2017VerificationSMTL TM3 - Fastener AssemblyView
2017-06-19-506/19/201706/20/2017Quality AssuranceConcreteView
2017-06-19-606/19/201706/20/2017Quality AssuranceConcreteView
2017-06-19-706/19/201706/20/2017Quality AssuranceConcreteView
2017-06-19-806/19/201706/20/2017Quality AssuranceConcreteView
2017-06-12-306/12/201706/13/2017Quality AssuranceConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

Displaying 1-1 of 1 result.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
JMF3511-23-2018-24Submittal Completeness in Review CT D03 - Olivehurst Northern Regional Laboratory04/19/2018View

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods