Project Details
This page displays current information for project DEA: 043G59U4.
Project Information
Project Identifiers | Project ID: 211538 DEA: 043G59U4 EFIS: 0415000066 |
---|---|
DIST-CO-RTE-PM | 04-ALA-205-0.0/1.004-Ala-580-0.0/8.0,26.1/30.310-SJ-580-13.5/15.4 |
Award Date | 10/24/2016 |
Closeout Date | 12/17/2019 |
Work Description | HMA PAVING, REPLACE APPROACH AND PCC SLABS, PRECAST CONCRETE PAVEMENT. |
Location Description | ALAMEDA AND SAN JOAQUIN COUNTIES ON ROUTE 580 FROM PATTERSON PASS ROAD OVERCROSSING TO GREENVILLE ROAD OVERHEAD AND FROM EDEN CANYON ROAD UNDERCROSSING TO STROBRIDGE AVENUE UNDERCROSSING ON ROUTE 205 FROM SAN JOAQUIN COUNTY LINE TO MIDWAY ROAD UNDERCROSSI |
QA Service Level | 1 (Verified on 09/02/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
john.parecadan@dot.ca.gov | John Parecadan | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-26 of 26 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-07-31-13 | 07/31/2017 | 08/08/2017 | Quality Assurance | Concrete | View |
2017-07-28-18 | 07/28/2017 | 08/08/2017 | Quality Assurance | Concrete | View |
2017-07-28-17 | 07/28/2017 | 08/08/2017 | Quality Assurance | Concrete | View |
2017-07-05-8 | 07/05/2017 | 07/05/2017 | Quality Assurance | Concrete | View |
2017-05-11-5 | 05/11/2017 | 05/16/2017 | Quality Assurance | Concrete | View |
2017-05-08-10 | 05/08/2017 | 05/16/2017 | Quality Assurance | Concrete | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods