Project Details
This page displays current information for project DIME:211460.
Project Information
Project Identifiers | Project ID: 211460 Permit Numbers: 0514NSN0317 0515NRW0015 0516NRT0068 0517NRT0287 0518NRT0155 |
---|---|
DIST-CO-RTE-PM | 05--101-85.9/86.3 |
Award Date | 10/23/2014 |
Closeout Date | 10/29/2020 |
Work Description | Operational improvements including signalize intersection and install ramp metering at Fairview Avenue/Sanborn Road |
Location Description | Hwy 101, Salinas |
QA Service Level | 1 (Verified on 05/11/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ignacio.saavedra@dot.ca.gov | Ignacio Saavedra | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-05-29-1 | 05/29/2018 | 05/31/2018 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods