Project Details
This page displays current information for project DIME:211422.
Project Information
Project Identifiers | Project ID: 211422 Permit Numbers: 04166DP0370 0415NSN1457 04176RT0232 0417NRT0118 |
---|---|
DIST-CO-RTE-PM | 04----1/-1 |
Award Date | 02/02/2016 |
Closeout Date | 01/18/2019 |
Work Description | As part of the El Camino Real crosswalk improvements project (City project. |
Location Description | El Camino Real, Santa Clara |
QA Service Level | 1 (Verified on 04/19/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
nscruggs@columbia-elec.com | Nick Scruggs | Oversight Resident Engineer | Caltrans REO DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods