Project Details

This page displays current information for project DIME:211268.

Project Information

Project IdentifiersProject ID: 211268
Permit Numbers: 0614NMC0863 0616NRT0014
DIST-CO-RTE-PM06-FRE-201-0/0.75
Award Date06/29/2015
Closeout Date09/24/2018
Work DescriptionInstall signal interconnect cable and conduit to synchronize the traffic signals within the project limits. The work also included but not limited to, install IP Cameras, install new pull boxes, construct new ADA curb ramps, etc
Location DescriptionSierra St, Kingsburg
QA Service Level1 (Verified on 03/14/2016)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
ramiro.hernandez@dot.ca.govRamiro HernandezResident EngineerCaltrans RE DB

Samples

Samples submitted for this project.

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods