Project Details
This page displays current information for project DEA: 072159U4.
Project Information
Project Identifiers | Project ID: 211260 DEA: 072159U4 EFIS: 0715000160 |
---|---|
DIST-CO-RTE-PM | 07-LA,ORA-5-0.0/1.5, 44.3/44.4 |
Award Date | 05/27/2016 |
Closeout Date | 08/01/2023 |
Work Description | CONSTRUCT HOV LANES AND MIX FLOW LANES. |
Location Description | LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK |
QA Service Level | 1 (Verified on 03/16/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
george.saker@dot.ca.gov | George Saker | Resident Engineer | Caltrans RE DB |
danny.lalonde@dot.ca.gov | Danny Lalonde | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1431-1440 of 1830 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-08-31-62 | 08/31/2021 | 09/01/2021 | Quality Control | Concrete | View |
2021-08-31-63 | 08/31/2021 | 09/01/2021 | Quality Control | Concrete | View |
2021-08-31-64 | 08/31/2021 | 09/01/2021 | Quality Control | Concrete | View |
2021-08-31-65 | 08/31/2021 | 09/01/2021 | Quality Control | Concrete | View |
2021-08-31-66 | 08/31/2021 | 09/01/2021 | Quality Control | Concrete | View |
2021-08-31-67 | 08/31/2021 | 09/01/2021 | Quality Control | Concrete | View |
2021-08-31-68 | 08/31/2021 | 09/01/2021 | Quality Control | Concrete | View |
2021-08-31-69 | 08/31/2021 | 09/01/2021 | Quality Control | Concrete | View |
2021-09-02-52 | 09/02/2021 | 09/02/2021 | Quality Control | Aggregate | View |
2021-09-02-53 | 09/02/2021 | 09/03/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods