Project Details
This page displays current information for project DEA: 031H4804.
Project Information
Project Identifiers | Project ID: 211254 DEA: 031H4804 EFIS: 0316000165 |
---|---|
DIST-CO-RTE-PM | 03-ED-193-23.4, 23.4, 23.4, 23.4, 23.40 |
Award Date | 01/30/2016 |
Closeout Date | 12/08/2017 |
Work Description | Emergency Slope Failure -Replace remaining section of gabion wall with soldier pile tieback wall and reconstruct roadway |
Location Description | El Dorado 193 |
QA Service Level | 1 (Verified on 03/07/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
Displaying 1-10 of 11 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2016-07-12-7 | 07/12/2016 | 07/21/2016 | Quality Control | Concrete | View |
2016-05-24-1 | 05/24/2016 | 05/26/2016 | Quality Control | Concrete | View |
2016-05-24-2 | 05/24/2016 | 05/26/2016 | Quality Control | Concrete | View |
2016-05-24-3 | 05/24/2016 | 05/26/2016 | Quality Control | Concrete | View |
2016-05-19-5 | 05/19/2016 | 05/20/2016 | Quality Control | Concrete | View |
2016-05-19-6 | 05/19/2016 | 05/20/2016 | Quality Control | Concrete | View |
2016-05-19-7 | 05/19/2016 | 05/20/2016 | Quality Control | Concrete | View |
2016-05-13-4 | 05/13/2016 | 05/16/2016 | Quality Control | Concrete | View |
2016-05-10-1 | 05/10/2016 | 05/11/2016 | Quality Assurance | Concrete | View |
2016-03-24-2 | 03/24/2016 | 03/25/2016 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods