Project Details
This page displays current information for project DEA: 080R4404.
Project Information
Project Identifiers | Project ID: 211238 DEA: 080R4404 EFIS: 0812000093 |
---|---|
DIST-CO-RTE-PM | 08-SBD-15-R23.0/R36.2 |
Award Date | 06/29/2016 |
Closeout Date | 08/08/2018 |
Work Description | INSTALL VEGETATION CONTROL UNDERNEATH EXISTING METAL BEAM GUARD RAIL |
Location Description | INSTALL VEGETATION CONTROL UNDERNEATH EXISTING METAL BEAM GUARD RAIL |
QA Service Level | 1 (Verified on 09/21/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-09-18-7 | 09/18/2017 | 09/19/2017 | Quality Control | Concrete | View |
2017-08-01-11 | 08/01/2017 | 08/03/2017 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods