Project Details
This page displays current information for project DEA: 044G4504.
Project Information
Project Identifiers | Project ID: 211162 DEA: 044G4504 EFIS: 0412000477 |
---|---|
DIST-CO-RTE-PM | 04-SOL-780-7.07 |
Award Date | 02/01/2017 |
Closeout Date | 11/15/2019 |
Work Description | REPLACE BRIDGE TO PROVIDE STANDARD VERTICAL CLEARANCE |
Location Description | LAUREL STREET OC |
QA Service Level | 1 (Verified on 05/20/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jolie.schneider@dot.ca.gov | Jolie Schneider | Resident Engineer | Caltrans RE DB |
joe.de.la.torre@dot.ca.gov | Joe De La Torre | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 45 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-08-15-7 | 08/15/2017 | 08/17/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2017-08-27-2 | 08/27/2017 | 10/05/2017 | Quality Control | Concrete | View |
2017-08-30-2 | 08/30/2017 | 09/01/2017 | Quality Assurance | Concrete | View |
2017-08-30-3 | 08/30/2017 | 09/01/2017 | Quality Assurance | Cementitious | View |
2017-09-18-8 | 09/18/2017 | 10/16/2017 | Quality Assurance | Concrete | View |
2017-10-04-2 | 10/04/2017 | 10/05/2017 | Quality Control | Concrete | View |
2017-10-06-5 | 10/06/2017 | 10/16/2017 | Quality Assurance | SMTL TM5 - Couplers | View |
2017-10-19-9 | 10/19/2017 | 10/23/2017 | Quality Assurance | Concrete | View |
2017-10-19-10 | 10/19/2017 | 10/23/2017 | Quality Assurance | Concrete | View |
2017-10-20-7 | 10/20/2017 | 10/23/2017 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods