Project Details
This page displays current information for project DEA: 044G4504.
Project Information
Project Identifiers | Project ID: 211162 DEA: 044G4504 EFIS: 0412000477 |
---|---|
DIST-CO-RTE-PM | 04-SOL-780-7.07 |
Award Date | 02/01/2017 |
Closeout Date | 11/15/2019 |
Work Description | REPLACE BRIDGE TO PROVIDE STANDARD VERTICAL CLEARANCE |
Location Description | LAUREL STREET OC |
QA Service Level | 1 (Verified on 05/20/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jolie.schneider@dot.ca.gov | Jolie Schneider | Resident Engineer | Caltrans RE DB |
joe.de.la.torre@dot.ca.gov | Joe De La Torre | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 45 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-12-12-11 | 12/12/2017 | 04/03/2018 | Annual Source Testing | Aggregate | View |
2017-12-12-10 | 12/12/2017 | 04/03/2018 | Annual Source Testing | Aggregate | View |
2017-12-12-9 | 12/12/2017 | 04/03/2018 | Annual Source Testing | Aggregate | View |
2017-12-12-3 | 12/12/2017 | 12/13/2017 | Quality Assurance | Concrete | View |
2017-12-05-3 | 12/05/2017 | 12/06/2017 | Quality Assurance | Concrete | View |
2017-12-04-3 | 12/04/2017 | 12/05/2017 | Quality Assurance | Concrete | View |
2017-11-29-4 | 11/29/2017 | 11/30/2017 | Quality Assurance | Concrete | View |
2017-11-22-3 | 11/22/2017 | 11/28/2017 | Quality Assurance | Concrete | View |
2017-11-14-7 | 11/14/2017 | 11/15/2017 | Quality Assurance | Concrete | View |
2017-11-01-20 | 11/01/2017 | 10/27/2017 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods