Project Details
This page displays current information for project DEA: 080N5504.
Project Information
Project Identifiers | Project ID: 211068 DEA: 080N5504 EFIS: 0800020102 |
---|---|
DIST-CO-RTE-PM | 08-SBD-40-R105.2/R106.5 |
Award Date | 04/21/2016 |
Closeout Date | 08/09/2018 |
Work Description | REPLACE THE LEFT WATSON WASH BRIDGE N0. 0805L |
Location Description | Not set |
QA Service Level | 1 (Verified on 05/10/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
darcy.davis@dot.ca.gov | Darcy Davis | Resident Engineer | Caltrans RE DB |
Leonard.remero@dot.ca.gov | Leonard Romero | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 28 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2016-09-26-6 | 09/26/2016 | 10/03/2016 | Quality Assurance | Concrete | View |
2016-09-26-7 | 09/26/2016 | 10/03/2016 | Quality Assurance | Concrete | View |
2016-10-31-4 | 10/31/2016 | 11/04/2016 | Quality Control | Concrete | View |
2016-11-03-9 | 11/03/2016 | 11/07/2016 | Quality Control | Concrete | View |
2016-11-02-10 | 11/02/2016 | 11/07/2016 | Quality Control | Concrete | View |
2016-11-08-7 | 11/08/2016 | 11/14/2016 | Quality Control | Concrete | View |
2016-11-22-1 | 11/22/2016 | 11/29/2016 | Quality Assurance | Concrete | View |
2016-11-17-11 | 11/17/2016 | 11/18/2016 | Quality Assurance | Concrete | View |
2016-12-21-6 | 12/21/2016 | 12/27/2016 | Quality Assurance | Concrete | View |
2017-02-04-5 | 02/04/2017 | 02/10/2017 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods