Project Details
This page displays current information for project DEA: 080J9904.
Project Information
Project Identifiers | Project ID: 211067 DEA: 080J9904 EFIS: 0800000327 |
---|---|
DIST-CO-RTE-PM | 08-SBD-18-49.0/51.7 |
Award Date | 04/13/2016 |
Closeout Date | 07/28/2023 |
Work Description | REPAIR AND REPLACED SIDEWALKS, CURBS & GUTTERS. |
Location Description | REPAIR AND REPLACED SIDEWALKS, CURBS & GUTTERS. |
QA Service Level | 1 (Verified on 07/27/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ken.t.tran@dot.ca.gov | Ken Tran | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-4 of 4 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2016-08-29-11 | 08/29/2016 | 09/01/2016 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2016-08-29-10 | 08/29/2016 | 09/01/2016 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2016-07-21-18 | 07/21/2016 | 07/20/2016 | Quality Assurance | Concrete | View |
2016-07-14-7 | 07/14/2016 | 07/20/2016 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods