Project Details
This page displays current information for project DEA: 01474804.
Project Information
Project Identifiers | Project ID: 211 DEA: 01474804 EFIS: 0100000330 |
---|---|
DIST-CO-RTE-PM | 01-MEN-1-38.5/38.9 |
Award Date | 10/25/2011 |
Closeout Date | 09/28/2012 |
Work Description | REALIGN ROADWAY, PLACE HMA OVER AB AND INSTALL DRAINAGE SYSTEMS. |
Location Description | MENDOCINO COUNTY NEAR ELK FROM 1.7 MILES TO 1.4 MILES SOUTH OF NAVARRO RIVER BRIDGE |
QA Service Level | 1 (Verified on 10/27/2011) |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods