Project Details
This page displays current information for project DEA: 044H9004.
Project Information
Project Identifiers | Project ID: 210873 DEA: 044H9004 EFIS: 0413000300 |
---|---|
DIST-CO-RTE-PM | 04-SF-280-R0.1,R1.5 |
Award Date | 12/14/2015 |
Closeout Date | 12/27/2017 |
Work Description | CONCRETE BARRIER, RETAINING WALL, SHOULDER AND SIDEWALK WIDENING |
Location Description | IN THE CITY AND COUNTY OF SANFRANCISCO AT ROUTE 280 SOUTHBOUND OFF-RAMP TO JOHN DALY BOULEVARD ANDAT SAN JOSE AVENUE OVERCROSSING |
QA Service Level | 1 (Verified on 01/25/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jose.david@dot.ca.gov | JOSE DAVID | Resident Engineer | Caltrans RE DB |
nick.tsai@dot.ca.gov | Nick Tsai | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2016-04-27-4 | 04/27/2016 | 05/05/2016 | Quality Control | Concrete | View |
2016-04-18-4 | 04/18/2016 | 04/21/2016 | Informational | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods