Project Details
This page displays current information for project DEA: 041SS034.
Project Information
Project Identifiers | Project ID: 210864 DEA: 041SS034 EFIS: 0400020869 |
---|---|
DIST-CO-RTE-PM | 04-ALA-580-R4.9/R5.6 |
Award Date | 12/18/2015 |
Closeout Date | 12/21/2017 |
Work Description | CONSTRUCT SOLDIER PILE WALL, AND RECONSTRUCTION OF LANES & SOULDERS |
Location Description | IN ALAMEDA COUNTY, ON WESTBOUND OF ROUTE 580. AT PM 5.0 |
QA Service Level | 1 (Verified on 10/28/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
kharakbir_sandhu@dot.ca.gov | KB Singh Sandhu | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 29 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2016-06-24-5 | 06/24/2016 | 06/29/2016 | Quality Assurance | Concrete | View |
2016-06-24-6 | 06/24/2016 | 06/29/2016 | Quality Assurance | Concrete | View |
2016-06-24-7 | 06/24/2016 | 06/29/2016 | Quality Assurance | Concrete | View |
2016-06-29-7 | 06/29/2016 | 07/08/2016 | Quality Control | Concrete | View |
2016-07-01-6 | 07/01/2016 | 07/08/2016 | Quality Control | Concrete | View |
2016-08-16-3 | 08/16/2016 | 08/18/2016 | Quality Control | Concrete | View |
2016-08-16-4 | 08/16/2016 | 08/18/2016 | Quality Control | Concrete | View |
2016-08-23-3 | 08/23/2016 | 08/26/2016 | Quality Control | Concrete | View |
2016-08-19-11 | 08/19/2016 | 08/26/2016 | Quality Control | Concrete | View |
2016-11-02-7 | 11/02/2016 | 11/04/2016 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods