Project Details
This page displays current information for project DEA: 031F4004.
Project Information
Project Identifiers | Project ID: 210862 DEA: 031F4004 EFIS: 0300020420 |
---|---|
DIST-CO-RTE-PM | 03-PLA-80-35.1/38.3 |
Award Date | 03/10/2016 |
Closeout Date | 06/19/2020 |
Work Description | WIDEN EASTBOUND ROADWAY |
Location Description | WIDEN EASTBOUND ROADWAY |
QA Service Level | 1 (Verified on 10/20/2015) |
Samples
Samples submitted for this project.
Displaying 21-30 of 58 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-08-06-5 | 08/06/2018 | 08/08/2018 | Quality Assurance | Concrete | View |
2018-08-06-6 | 08/06/2018 | 08/08/2018 | Quality Assurance | Concrete | View |
2018-08-06-7 | 08/06/2018 | 08/08/2018 | Quality Assurance | Concrete | View |
2018-08-06-8 | 08/06/2018 | 08/08/2018 | Quality Assurance | Concrete | View |
2018-07-26-4 | 07/26/2018 | 07/31/2018 | Quality Assurance | SMTL TM7 - Epoxy Coated Rebar | View |
2018-07-26-9 | 07/26/2018 | 08/29/2017 | Quality Assurance | Concrete | View |
2018-07-24-6 | 07/24/2018 | 08/29/2017 | Quality Assurance | Concrete | View |
2018-07-09-10 | 07/09/2018 | 08/29/2017 | Quality Assurance | Concrete | View |
2018-01-09-11 | 01/09/2018 | 01/26/2018 | Preliminary | Soil | View |
2017-08-25-4 | 08/25/2017 | 08/29/2017 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted by | DIME Sample ID | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs submitted for this project.
Declaration Number | Program Operator | Material Type | Vendor | Submitted by |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods