Project Details
This page displays current information for project DEA: 020E0904.
Project Information
Project Identifiers | Project ID: 210808 DEA: 020E0904 EFIS: 0200000016 |
---|---|
DIST-CO-RTE-PM | 02-SHA-5-R29.3/R31.1,R45.0/R45.8 |
Award Date | 02/03/2016 |
Closeout Date | 10/21/2020 |
Work Description | REPLACE BRIDGE, REALIGN ROADWAY AND SEISMIC RETROFIT |
Location Description | IN SHASTA COUNTY ABT 8 MI N OF SHASTA LAKE CTY AND NEAR LAKEHEAD FRM TURNTABLE BAY O/C TO 0.1 MI N OF O'BRIEN SRRA & FRM 0.4 MI S TO 0.3 MI N OF DOG CREEK BRIDGE. |
QA Service Level | 1 (Verified on 09/23/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
nathan.alexander@dot.ca.gov | Nathan Alexander | Resident Engineer | Caltrans RE DB |
chris.brace@dot.ca.gov | Christopher S 'Chris' Brace | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 81-90 of 96 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-07-11-17 | 07/11/2018 | 07/13/2018 | Quality Assurance | Concrete | View |
2016-11-11-1 | 11/11/2016 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2016-12-21-1 | 12/21/2016 | 12/21/2016 | Quality Control | SMTL TM5 - Welded Hoops | View |
2016-12-27-2 | 12/27/2016 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2016-12-27-3 | 12/27/2016 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2017-02-16-2 | 02/16/2017 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2017-02-16-3 | 02/16/2017 | 02/16/2017 | Quality Control | SMTL TM5 - Welded Hoops | View |
2017-03-17-1 | 03/17/2017 | 03/17/2017 | Quality Control | SMTL TM5 - Welded Hoops | View |
2017-03-17-2 | 03/17/2017 | 03/17/2017 | Quality Control | SMTL TM5 - Welded Hoops | View |
2018-04-26-4 | 04/26/2018 | 05/01/2018 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods