Project Details
This page displays current information for project DEA: 030G0304.
Project Information
Project Identifiers | Project ID: 210798 DEA: 030G0304 EFIS: 0314000027 |
---|---|
DIST-CO-RTE-PM | 03-ED,PLA-50,80,193-VAR |
Award Date | 02/10/2016 |
Closeout Date | 11/30/2017 |
Work Description | RESURFACE BRIDGE DECKS, JOINT SEALS, CONCRETE BARRIER AND SLABS. |
Location Description | IN EL DORADO AND PLACER COUNTIES ATVARIOUS LOCATIONS (FED SPES NUMBER 00PE015) |
QA Service Level | 1 (Verified on 10/20/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Veera.Nanugonda@dot.ca.gov | Veera Nanugonda | Resident Engineer | Caltrans RE DB |
paul.hayes@dot.ca.gov | Paul Hayes | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 10 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2016-05-06-8 | 05/06/2016 | 05/06/2016 | Quality Control | Concrete | View |
2016-07-06-9 | 07/06/2016 | 07/12/2016 | Quality Assurance | Concrete | View |
2016-07-08-6 | 07/08/2016 | 07/12/2016 | Quality Assurance | Concrete | View |
2016-07-19-5 | 07/19/2016 | 07/22/2016 | Quality Assurance | Concrete | View |
2016-07-22-4 | 07/22/2016 | 07/25/2016 | Quality Assurance | Concrete | View |
2016-08-03-2 | 08/03/2016 | 08/04/2016 | Quality Assurance | Concrete | View |
2016-08-18-6 | 08/18/2016 | 08/22/2016 | Quality Assurance | Concrete | View |
2016-09-14-1 | 09/14/2016 | 09/16/2016 | Quality Control | Concrete | View |
2016-09-14-2 | 09/14/2016 | 09/16/2016 | Quality Control | Concrete | View |
2016-10-20-3 | 10/20/2016 | 10/21/2016 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods