Project Details

This page displays current information for project DEA: 062HT104.

Project Information

Project IdentifiersProject ID: 210794
DEA: 062HT104
EFIS: 0612000287
DIST-CO-RTE-PM06-FRE-99-23.5/26.7
Award Date06/30/2016
Closeout Date09/16/2020
Work Description(Alternative Delivery) Realign Freeway CONTACT SMR PRIOR TO PERFORMING ANY TESTING OR INSPECTION. CMGC PROJECT. Realign Route 99 between Ashlan Avenue and Olive Avenue to accommodate the High Speed Train (HST).
Location DescriptionState Highway 99 in Fresno (Fresno County) from 0.2 miles North of Olive Ave over-crossing to 0.2 miles North of Ashlan Ave over-crossing.
QA Service Level1 (Verified on 10/01/2015)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
justin.kimura@dot.ca.govJustin KimuraResident EngineerCaltrans RE DB
daniel.chapa@dot.ca.govDaniel ChapaStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 21-30 of 50 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2017-04-28-504/28/201705/02/2017Quality AssuranceSMTL TM5 - Threaded BarView
2017-04-28-604/28/201705/02/2017Quality AssuranceSMTL TM5 - Threaded BarView
2017-06-06-106/06/201706/07/2017Quality AssuranceSMTL TM5 - Welded HoopsView
2017-06-06-206/06/2017Quality ControlSMTL TM5 - Welded HoopsView
2017-06-14-906/14/201706/15/2017Quality AssuranceSMTL TM5 - CouplersView
2017-07-26-207/26/201707/27/2017Quality AssuranceSMTL TM5 - Headed BarsView
2017-08-28-608/28/201708/30/2017Quality AssuranceSMTL TM5 - CouplersView
2017-08-28-708/28/201708/30/2017Quality AssuranceSMTL TM5 - CouplersView
2017-09-15-209/15/2017Quality AssuranceSMTL TM5 - Welded HoopsView
2017-09-15-309/15/2017Quality AssuranceSMTL TM5 - Welded HoopsView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods