Project Details
This page displays current information for project DEA: 071193U4.
Project Information
Project Identifiers | Project ID: 210735 DEA: 071193U4 EFIS: 0713000007 |
---|---|
DIST-CO-RTE-PM | 07-LA-10-37.2/42.4 |
Award Date | 11/16/2015 |
Closeout Date | 07/11/2022 |
Work Description | CONSTRUCT HOV LANES, WIDEN BRIDGES, AND REALIGN RAMPS. |
Location Description | IN LA COUNTY FROM CITRUS STREET IN WEST COVINA TO ROUTE 57 IN POMONA |
QA Service Level | 1 (Verified on 03/07/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
rodolfo.c.cao@dot.ca.gov | Rodolfo Cao | Resident Engineer | Caltrans RE DB |
thein.win@dot.ca.gov | David Win | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 175 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2016-05-19-15 | 05/19/2016 | 05/23/2016 | Annual Source Testing | Aggregate | View |
2016-05-19-16 | 05/19/2016 | 05/23/2016 | Annual Source Testing | Aggregate | View |
2016-05-19-17 | 05/19/2016 | 05/23/2016 | Annual Source Testing | Aggregate | View |
2016-06-03-5 | 06/03/2016 | 06/07/2016 | Quality Assurance | SMTL TM6 - Ductile Iron Cast Samples | View |
2016-06-08-4 | 06/08/2016 | 06/10/2016 | Quality Assurance | SMTL TM6 - Ductile Iron Cast Samples | View |
2016-06-15-13 | 06/15/2016 | 06/23/2016 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
2016-06-15-14 | 06/15/2016 | 06/23/2016 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
2016-06-15-15 | 06/15/2016 | 06/23/2016 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
2016-06-15-16 | 06/15/2016 | 06/23/2016 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
2016-06-15-17 | 06/15/2016 | 06/23/2016 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods