Project Details
This page displays current information for project DEA: 071193U4.
Project Information
Project Identifiers | Project ID: 210735 DEA: 071193U4 EFIS: 0713000007 |
---|---|
DIST-CO-RTE-PM | 07-LA-10-37.2/42.4 |
Award Date | 11/16/2015 |
Closeout Date | 07/11/2022 |
Work Description | CONSTRUCT HOV LANES, WIDEN BRIDGES, AND REALIGN RAMPS. |
Location Description | IN LA COUNTY FROM CITRUS STREET IN WEST COVINA TO ROUTE 57 IN POMONA |
QA Service Level | 1 (Verified on 03/07/2016) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
rodolfo.c.cao@dot.ca.gov | Rodolfo Cao | Resident Engineer | Caltrans RE DB |
thein.win@dot.ca.gov | David Win | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 91-100 of 175 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-05-19-1 | 05/19/2018 | 05/23/2018 | Quality Assurance | Concrete | View |
2018-05-10-10 | 05/10/2018 | 05/23/2018 | Quality Assurance | Concrete | View |
2018-06-08-4 | 06/08/2018 | 06/12/2018 | Quality Assurance | Concrete | View |
2018-06-09-1 | 06/09/2018 | 06/11/2018 | Quality Assurance | Concrete | View |
2018-06-09-3 | 06/09/2018 | 06/11/2018 | Quality Assurance | Concrete | View |
2018-06-13-5 | 06/13/2018 | 06/19/2018 | Quality Assurance | Concrete | View |
2018-06-15-12 | 06/15/2018 | 06/19/2018 | Quality Assurance | Concrete | View |
2018-06-15-13 | 06/15/2018 | 06/19/2018 | Quality Assurance | Concrete | View |
2018-05-25-12 | 05/25/2018 | 06/19/2018 | Quality Assurance | Concrete | View |
2018-06-29-11 | 06/29/2018 | 07/02/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods