Project Details
This page displays current information for project DIME:210703.
Project Information
Project Identifiers | Project ID: 210703 Permit Numbers: 04156DP1438 0414NMC1139 0415NRT1459 |
---|---|
DIST-CO-RTE-PM | 04-SM--27.65/27.65 |
Award Date | 12/16/2014 |
Closeout Date | 09/14/2018 |
Work Description | Improvements include roadway widening to include an additional eastbound right turn lane,new sidewalk and a Class 1 Bike Path along Willow Rd between the existing railroad tracks and the existing Bay Trail located near Bayfront Expwy. |
Location Description | Willow Road / Bayfront Exp., Menlo Park |
QA Service Level | 1 (Verified on 07/29/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
george.lee@dot.ca.gov | George Lee | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods