Project Details
This page displays current information for project DEA: 080M2804.
Project Information
| Project Identifiers | Project ID: 210696 DEA: 080M2804 EFIS: 0800000472 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-15-171.8/173.8 |
| Award Date | 11/04/2015 |
| Closeout Date | 08/21/2018 |
| Work Description | BRIDGE REPLACEMENT AND WIDEN, CONC AND HMA PVMT, COLD PLANE AC PVMT. |
| Location Description | In SBD County |
| QA Service Level | 1 (Verified on 10/19/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| john.santos@dot.ca.gov | John Santos | Resident Engineer | Caltrans RE DB |
| fzahlout@syrusaengineering.com | Faisal Zahlout | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 43 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2017-10-10-9 | 10/10/2017 | 10/16/2017 | Quality Assurance | Concrete | View |
| 2017-10-03-5 | 10/03/2017 | 10/23/2017 | Quality Assurance | Concrete | View |
| 2017-10-03-4 | 10/03/2017 | 10/10/2017 | Quality Assurance | Concrete | View |
| 2017-09-05-1 | 09/05/2017 | 09/08/2017 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
| 2017-08-18-9 | 08/18/2017 | 08/25/2017 | Quality Assurance | Concrete | View |
| 2017-07-25-5 | 07/25/2017 | 07/25/2017 | Verification | SMTL TM7 - Epoxy Coated Rebar | View |
| 2017-07-21-8 | 07/21/2017 | 07/26/2017 | Quality Assurance | Concrete | View |
| 2017-07-21-7 | 07/21/2017 | 07/26/2017 | Quality Assurance | Concrete | View |
| 2017-07-21-6 | 07/21/2017 | 07/26/2017 | Quality Assurance | Concrete | View |
| 2017-05-24-5 | 05/24/2017 | 05/26/2017 | Quality Assurance | SMTL TM5 - Couplers | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
