Project Details
This page displays current information for project DEA: 080K2924.
Project Information
Project Identifiers | Project ID: 210695 DEA: 080K2924 EFIS: 0812000099 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-32.9/R37.4 |
Award Date | 10/30/2015 |
Closeout Date | 08/08/2018 |
Work Description | REPLACE EXISTING (PCCP) WITH (RSCP). |
Location Description | IN/NEAR REDLANDS FROM 0.2 MILE W/O FORD STREET TO 0.4 MILE E/O LIVEOAK CANYON ROAD. |
QA Service Level | 1 (Verified on 10/19/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
maged.youssef@dot.ca.gov | Maged Youssef | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 54 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-04-01-4 | 04/01/2017 | 04/03/2017 | Quality Control | Concrete | View |
2017-04-09-1 | 04/09/2017 | 04/10/2017 | Quality Control | Concrete | View |
2017-04-09-2 | 04/09/2017 | 04/10/2017 | Quality Control | Concrete | View |
2016-08-27-1 | 08/27/2016 | 08/31/2016 | Quality Assurance | Concrete | View |
2016-09-24-1 | 09/24/2016 | 09/28/2016 | Quality Assurance | Concrete | View |
2016-09-24-2 | 09/24/2016 | 09/28/2016 | Quality Assurance | Concrete | View |
2016-09-24-3 | 09/24/2016 | 09/28/2016 | Quality Assurance | Concrete | View |
2016-10-15-1 | 10/15/2016 | 10/15/2016 | Quality Assurance | Concrete | View |
2016-10-15-2 | 10/15/2016 | 10/15/2016 | Quality Assurance | Concrete | View |
2016-10-15-3 | 10/15/2016 | 10/15/2016 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods