Project Details
This page displays current information for project DEA: 042640F4.
Project Information
| Project Identifiers | Project ID: 210673 DEA: 042640F4 EFIS: 0400020132 COOP: 042308A3 |
|---|---|
| DIST-CO-RTE-PM | 04-SON-- |
| Award Date | 08/08/2019 |
| Closeout Date | 02/16/2024 |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 04/11/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| gina.choi@dot.ca.gov | Gina Choi | Resident Engineer | Caltrans RE DB |
| brian.f.beaudoin@dot.ca.gov | Brian Beaudoin | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 321-330 of 342 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-06-17-35 | 06/17/2022 | 06/27/2022 | Quality Assurance | Concrete | View |
| 2022-06-17-36 | 06/17/2022 | 06/27/2022 | Quality Assurance | Concrete | View |
| 2022-06-23-35 | 06/23/2022 | 06/27/2022 | Quality Assurance | Concrete | View |
| 2022-06-24-24 | 06/24/2022 | 06/27/2022 | Quality Assurance | Concrete | View |
| 2022-06-08-37 | 06/08/2022 | 06/29/2022 | Quality Assurance | Concrete | View |
| 2022-07-08-15 | 07/08/2022 | 07/08/2022 | Quality Assurance | Concrete | View |
| 2019-10-25-6 | 10/25/2019 | Quality Control | SMTL TM5 - Welded Hoops | View | |
| 2019-10-25-7 | 10/25/2019 | Quality Control | SMTL TM5 - Welded Hoops | View | |
| 2019-10-25-9 | 10/25/2019 | Quality Control | SMTL TM5 - Welded Hoops | View | |
| 2020-01-02-1 | 01/02/2020 | Quality Control | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-1 of 1 result.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| JMF3511-318-2020-283 | Submittal Accepted for Verification | CT D04 - Hayward DME / District Laboratory | 09/02/2020 | View |
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
