Project Details
This page displays current information for project DEA: 11409304.
Project Information
Project Identifiers | Project ID: 210549 DEA: 11409304 EFIS: 1112000070 |
---|---|
DIST-CO-RTE-PM | 11-SD-75,15,163-R21.0/R21.6 |
Award Date | 09/01/2015 |
Closeout Date | 07/05/2019 |
Work Description | CLEAN AND PAINT THE CORONADO BRIDGE AND BUILD TRAVELER SYSTEMS. |
Location Description | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.9 NORTH TO 1.5 MILES NORTH OF GLORIETTA BOULEVARD |
QA Service Level | 1 (Verified on 09/22/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
victor.t.yoon@dot.ca.gov | Victor Yoon | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-06-19-2 | 06/19/2017 | 06/21/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2017-06-19-1 | 06/19/2017 | 06/21/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods