Project Details
This page displays current information for project DEA: 041G6224.
Project Information
Project Identifiers | Project ID: 210466 DEA: 041G6224 EFIS: 0415000237 COOP: 042579 |
---|---|
DIST-CO-RTE-PM | 04-SM-101-8.1/8.6 |
Award Date | 11/26/2018 |
Closeout Date | 09/27/2022 |
Work Description | US 101 / Holly Street Interchange Modification - Construct Class 1 pedestrian and bicycle overcrossing (POC) bridge |
Location Description | Over U.S. 101 |
QA Service Level | 2 (Verified on 10/30/2018) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
pgoryl@mnsengineers.com | Paul Goryl | Oversight Resident Engineer | Caltrans REO DB |
akleiber@msnengineers.com | Andy Kleiber | Oversight Structural Representative | Caltrans SRO DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods