Project Details
This page displays current information for project DEA: 08432724.
Project Information
Project Identifiers | Project ID: 210409 DEA: 08432724 EFIS: 0800020178 |
---|---|
DIST-CO-RTE-PM | 08-RIV-8-RIV-15-6.4/9.7 |
Award Date | 05/01/2023 |
Closeout Date | Not set |
Work Description | Collector/distributor system, new on-ramps, bridges, RW, sound walls, drainage, signal and lighting, signage, freeway widening |
Location Description | I-15 from Winchester Road to I-215 Junction in Temecula |
QA Service Level | 2 (Verified on 06/24/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Mike.Bergevin@dot.ca.gov | Mike Bergevin | Resident Engineer | Caltrans RE DB |
jrojas@falcon-ca.com | Juan Rojas | Oversight Resident Engineer | Caltrans REO DB |
Arnel.Vega@dot.ca.gov | Arnel Vega | Structural Representative | Caltrans SR DB |
swalker@falcon-ca.com | Scott Walker | Oversight Structural Representative | Caltrans SRO DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 39 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-12-12-55 | 12/12/2023 | 12/28/2023 | Quality Control | Concrete | View |
2023-12-13-53 | 12/13/2023 | 12/28/2023 | Quality Control | Concrete | View |
2023-12-14-51 | 12/14/2023 | 12/28/2023 | Quality Control | Concrete | View |
2023-12-15-64 | 12/15/2023 | 12/28/2023 | Quality Control | Concrete | View |
2023-12-18-53 | 12/18/2023 | 01/08/2024 | Quality Control | Concrete | View |
2023-12-19-20 | 12/19/2023 | 01/08/2024 | Quality Control | Concrete | View |
2023-12-20-22 | 12/20/2023 | 01/08/2024 | Quality Control | Concrete | View |
2023-12-21-21 | 12/21/2023 | 01/08/2024 | Quality Control | Concrete | View |
2023-12-27-21 | 12/27/2023 | 01/08/2024 | Quality Control | Concrete | View |
2023-12-28-28 | 12/28/2023 | 01/08/2024 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-3 of 3 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
EPD-191 | Carbon Steel Rebar | CMC - Mesa | Surecast West (becki mastroleo) | 3993 lbs |
EPD-191 | Carbon Steel Rebar | CMC - Mesa | Surecast West (becki mastroleo) | 3946 lbs |
EPD-191 | Carbon Steel Rebar | CMC - Knoxville | Surecast West (becki mastroleo) | 8597 lbs |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods