Project Details
This page displays current information for project DEA: 08432724.
Project Information
Project Identifiers | Project ID: 210409 DEA: 08432724 EFIS: 0800020178 |
---|---|
DIST-CO-RTE-PM | 08-RIV-8-RIV-15-6.4/9.7 |
Award Date | 05/01/2023 |
Closeout Date | Not set |
Work Description | Collector/distributor system, new on-ramps, bridges, RW, sound walls, drainage, signal and lighting, signage, freeway widening |
Location Description | I-15 from Winchester Road to I-215 Junction in Temecula |
QA Service Level | 2 (Verified on 06/24/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Mike.Bergevin@dot.ca.gov | Mike Bergevin | Resident Engineer | Caltrans RE DB |
jrojas@falcon-ca.com | Juan Rojas | Oversight Resident Engineer | Caltrans REO DB |
Arnel.Vega@dot.ca.gov | Arnel Vega | Structural Representative | Caltrans SR DB |
swalker@falcon-ca.com | Scott Walker | Oversight Structural Representative | Caltrans SRO DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 39 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-11-28-45 | 11/28/2023 | 12/11/2023 | Quality Control | Concrete | View |
2023-11-29-30 | 11/29/2023 | 12/11/2023 | Quality Control | Concrete | View |
2023-11-30-48 | 11/30/2023 | 12/11/2023 | Quality Control | Concrete | View |
2023-12-01-38 | 12/01/2023 | 12/11/2023 | Quality Control | Concrete | View |
2023-12-04-68 | 12/04/2023 | 12/11/2023 | Quality Control | Concrete | View |
2023-12-05-74 | 12/05/2023 | 12/28/2023 | Quality Control | Concrete | View |
2023-12-06-35 | 12/06/2023 | 12/28/2023 | Quality Control | Concrete | View |
2023-12-07-48 | 12/07/2023 | 12/28/2023 | Quality Control | Concrete | View |
2023-12-08-51 | 12/08/2023 | 12/28/2023 | Quality Control | Concrete | View |
2023-12-11-57 | 12/11/2023 | 12/28/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-3 of 3 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | Surecast West (becki mastroleo) | 3993 lbs |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | Surecast West (becki mastroleo) | 3946 lbs |
EPD-191 | Carbon Steel Rebar | CMC - Knoxville | Surecast West (becki mastroleo) | 8597 lbs |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods