Project Details
This page displays current information for project DEA: 043J1204.
Project Information
Project Identifiers | Project ID: 210204 DEA: 043J1204 EFIS: 0415000089 |
---|---|
DIST-CO-RTE-PM | 04-NAP-129-20.2 |
Award Date | 02/05/2015 |
Closeout Date | 12/19/2017 |
Work Description | Replace bearing pads, bearing stiffeners, and seals, and cut off girder ends. |
Location Description | In Napa County, at 1.14 miles east of Knoxville Road at Capell Creek Bridge |
QA Service Level | 1 (Verified on 04/16/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jyotsna.sharma@dot.ca.gov | Joy Sharma | Resident Engineer | Caltrans RE DB |
chris.moulton@dot.ca.gov | Chris Moulton | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-4 of 4 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-07-28-1 | 07/28/2015 | 07/29/2015 | Quality Control | Concrete | View |
2015-07-28-2 | 07/28/2015 | 07/29/2015 | Quality Control | Concrete | View |
2015-07-28-3 | 07/28/2015 | 07/29/2015 | Quality Control | Concrete | View |
2015-07-28-4 | 07/28/2015 | 07/29/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods