Project Details

This page displays current information for project DEA: 043G9204.

Project Information

Project IdentifiersProject ID: 210077
DEA: 043G9204
EFIS: 0414000507
COOP: 042565
DIST-CO-RTE-PM04-ALA-880-9.5/10.0
Award DateNot set
Closeout Date02/10/2021
Work DescriptionConversion of HOV Lanes to Express Lanes on I-880 ; Installation of the necessary Backhaul Communicaiton Network from Rte 237 to Hegenberger Road
Location DescriptionBetween Rte 237 and Lewelling Road and I-880 SB between Rte 237 and Hegenberger Road.
QA Service Level2 (Verified on 09/20/2017)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
vincent.tang@dot.ca.govVincent TangResident EngineerCaltrans RE DB
nhissen@zoon-eng.comNabil HissenOversight Resident EngineerCaltrans REO DB
nhissen@zoon-eng.comNabil HissenOversight Structural RepresentativeCaltrans SRO DB

Samples

Samples submitted for this project.

Displaying 1-1 of 1 result.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2018-07-12-707/12/201807/12/2018VerificationSMTL TM3 - Fastener AssemblyView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods