Project Details

This page displays current information for project DEA: 04297624.

Project Information

Project IdentifiersProject ID: 210040
DEA: 04297624
EFIS: 0400020581
COOP: 042558
DIST-CO-RTE-PM04-ALA-84-22.9/25.7
Award Date09/30/2015
Closeout Date03/12/2020
Work DescriptionWIDENING AND EXPRESSWAY UPGRADES
Location DescriptionON ROUTE 84, FROM RUBY HILL DRIVE TO NORTH OF CONCANNON BOULEVARD
QA Service Level1 (Verified on 11/10/2015)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
rommel.pardo@dot.ca.govRaif RihaniResident EngineerCaltrans RE DB
arsenio.escat@dot.ca.govArsenio EscatStructural RepresentativeCaltrans SR DB
saman.barzegari@dot.ca.govSaman BarzegariMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 52 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2018-11-13-811/13/201811/27/2018Quality AssuranceConcreteView
2018-07-02-1907/02/201806/26/2018Quality AssuranceConcreteView
2018-07-02-1807/02/201806/26/2018Quality AssuranceConcreteView
2018-06-07-706/07/201806/26/2018Quality AssuranceConcreteView
2018-05-11-1205/11/201805/23/2018Quality AssuranceConcreteView
2018-05-11-1105/11/201805/23/2018Quality AssuranceConcreteView
2018-05-11-1005/11/201805/23/2018Quality AssuranceConcreteView
2018-02-08-102/08/201802/12/2018Quality AssuranceSMTL TM5 - Welded HoopsView
2017-08-11-1208/11/201708/31/2017Quality AssuranceConcreteView
2017-08-11-1108/11/201708/31/2017Quality AssuranceConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods