Project Details
This page displays current information for project DEA: 080N56U4.
Project Information
Project Identifiers | Project ID: 209950 DEA: 080N56U4 EFIS: 0813000176 |
---|---|
DIST-CO-RTE-PM | 08-SBD-40-R94.7/R99.7 |
Award Date | 01/22/2015 |
Closeout Date | 09/17/2018 |
Work Description | BRIDGE REPLACEMENTS. |
Location Description | SAN BERNARDINO COUNTY NEAR ESSEX AT HALLER WASH BRIDGE AT ROJO WASH BRIDGE AND AT CLIPPER VALLEY WASH BRIDGE |
QA Service Level | 1 (Verified on 04/29/2015) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
darcy.davis@dot.ca.gov | Darcy Davis | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 80 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-09-08-4 | 09/08/2015 | 09/14/2015 | Quality Control | Concrete | View |
2015-09-24-4 | 09/24/2015 | 09/28/2015 | Quality Control | Concrete | View |
2015-10-15-10 | 10/15/2015 | 10/22/2015 | Quality Control | Concrete | View |
2015-10-15-11 | 10/15/2015 | 10/22/2015 | Quality Control | Concrete | View |
2015-10-15-12 | 10/15/2015 | 10/22/2015 | Quality Control | Concrete | View |
2015-10-15-13 | 10/15/2015 | 10/22/2015 | Quality Control | Concrete | View |
2015-10-26-4 | 10/26/2015 | 11/05/2015 | Quality Control | Concrete | View |
2015-10-26-5 | 10/26/2015 | 10/26/2015 | Quality Control | Concrete | View |
2015-11-02-2 | 11/02/2015 | 11/06/2015 | Quality Control | Concrete | View |
2015-11-02-3 | 11/02/2015 | 11/06/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods